//-->
Sharing Supermodular Costs
Schulz, Andreas S., (2010)
Minimizing the sum of weighted completion times in a concurrent open shop
Mastrolilli, Monaldo, (2010)
Near-optimal solutions and large integrality gaps for almost all instances of single-machine precedence-constrained scheduling
Schulz, Andreas S., (2011)