Network construction problems with due dates
| Year of publication: |
2015
|
|---|---|
| Authors: | Averbakh, Igor ; Pereira, Jordi |
| Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 244.2015, 3, p. 715-729
|
| Publisher: |
Elsevier |
| Subject: | Scheduling | Network design | Network construction | Emergency restoration | Integrated network design and scheduling |
-
Network construction problems with due dates
Averbakh, Igor, (2015)
-
Tree optimization based heuristics and metaheuristics in network construction problems
Averbakh, Igor, (2021)
-
Lateness minimization in pairwise connectivity restoration problems
Averbakh, Igor, (2018)
- More ...
-
Tree optimization based heuristics and metaheuristics in network construction problems
Averbakh, Igor, (2021)
-
Lateness minimization in pairwise connectivity restoration problems
Averbakh, Igor, (2018)
-
Exact and heuristic algorithms for the interval data robust assignment problem
Pereira, Jordi, (2011)
- More ...