Network expansion by a proactive transmission system operator: A case study
Year of publication: |
2014
|
---|---|
Authors: | Groppi, Angelamaria ; Fumagalli, Elena |
Published in: |
Energy Policy. - Elsevier, ISSN 0301-4215. - Vol. 69.2014, C, p. 610-623
|
Publisher: |
Elsevier |
Subject: | Transmission network | Investment planning | Anticipation |
-
Transmission Network Investment as an Anticipation Problem
Rious, Vincent, (2010)
-
Power Transmission Network Investment as an Anticipation Problem
Rious, Vincent, (2011)
-
Supply Function Equilibria in Networks with Transport Constraints
Holmberg, Pär, (2012)
- More ...
-
Siting locally-unwanted facilities: What can be learnt from the location of Italian power plants
Garrone, Paola, (2012)
-
Siting locally-unwanted facilities: What can be learnt from the location of Italian power plants
Garrone, Paola, (2012)
-
Siting Locally-Unwanted Facilities : What Can Be Learnt from the Location of Italian Power Plants
Garrone, Paola, (2012)
- More ...