New heuristics for the 2-stage assembly scheduling problem with total earliness and tardiness minimisation : a computational evaluation
Year of publication: |
2024
|
---|---|
Authors: | Talens, Carla ; Valente, Jorge M. S. ; Fernandez-Viagas, Victor |
Published in: |
Computers & operations research : an international journal. - Amsterdam [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 1499736-8. - Vol. 172.2024, Art.-No. 106824, p. 1-11
|
Subject: | Scheduling | Assembly | Earliness | Tardiness | Just in time | Heuristics | Heuristik | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Durchlaufzeit | Lead time | Algorithmus | Algorithm | Just in Time | Produktionsplanung | Production planning | Branch-and-Bound | Branch and Bound |
-
A two-stage three-machine assembly scheduling problem with a position-based learning effect
Wu, Chin-Chia, (2018)
-
A two-stage three-machine assembly scheduling problem with deterioration effect
Wu, Chin-Chia, (2019)
-
Lei, Deming, (2021)
- More ...
-
Assembly flowshop scheduling problem : speed-up procedure and computational evaluation
Fernandez-Viagas, Victor, (2022)
-
Heuristics for the single machine scheduling problem with early and quadratic tardy penalties
Valente, Jorge M. S., (2007)
-
Heuristics for the single machine scheduling problem with early and quadratic tardy penalties
Valente, Jorge M. S., (2007)
- More ...