//-->
Non-convex costs and capital utilization : a study of production scheduling at automobile assembly plants
Hall, George J., (2000)
Overtime, effort and the propagation of business cycle shocks
Hall, George J., (1994)
Non-convex costs and capital utilization : a study of production and inventories at automobile assembly plants
Hall, George J., (1996)