//-->
Job shop management of products under internal lifespan and external due date
Gonzalez-R., Pedro L., (2018)
Optimal priority ordering in PHP production of multiple part-types in a failure-prone machine
Sánchez, Ana, (2009)
Modeling and analysis of a new production methodology for achieving mass customization
Singh, Sanchit, (2024)
The three-machine proportionate open shop and mixed shop minimum makespan problems
Koulamas, Christos, (2015)
Performance guarantees for flowshop heuristics to minimize makespan
Gupta, Jatinder N.D., (2006)
Flexible flow shop scheduling with uniform parallel machines
Kyparisis, George J., (2006)