//-->
Lexicographic optimization of a permutation flow shop scheduling problem with the time lag constraints
Dhouib, E., (2013)
Looking for the best modes helps solving the MRCPSP/max
Ballestin, Francisco, (2013)
Polynomial-time approximation schemes for scheduling problems with time lags
Zhang, Xiandong, (2010)
Scheduling an unbounded batching machine with family hobs and setup times
Zheng, R., (2012)
Approximation algorithms for the parallel flow shop problem
Zhang, Xiandong, (2012)
Overbooking for parallel flights with transference
Huang, Yiqian, (2013)