Online heuristics for unloading boxes off a gravity conveyor
Year of publication: |
1-15 June 2017
|
---|---|
Authors: | Baptiste, Pierre ; Bürgy, Reinhard ; Hertz, Alain ; Rebaine, Djamal |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 55.2017, 11/12 (1/15.6.), p. 3046-3057
|
Subject: | sequencing | real-time scheduling | heuristics | gravity conveyor | online optimisation | Heuristik | Heuristics | Scheduling-Verfahren | Scheduling problem | Gravitationsmodell | Gravity model | Theorie | Theory | Algorithmus | Algorithm |
-
Real-time scheduling in manufacturing system with machining and assembly operations : a state of art
Khodke, P. M., (2013)
-
An efficient iterated local search algorithm for the total tardiness blocking flow shop problem
Ribas, Imma, (2013)
-
A time predefined variable depth search for nurse rostering
Burke, Edmund K., (2013)
- More ...
-
An exact dynamic programming algorithm for the precedence-constrained class sequencing problem
Bürgy, Reinhard, (2020)
-
Baptiste, Pierre, (2017)
-
Benkalai, Imène, (2017)
- More ...