//-->
Creating lean value streams through proactive variability management
Richter, Ralph, (2023)
An improved event-triggered predictive control for capacity adjustment in reconfigurable job-shops
Zhang, Qiang, (2023)
Production systems engineering : main results and recommendations for management
Li, Jingshan, (2013)
Optimal and heuristic lot-sizing procedures for multi-stage manufacturing systems
Moily, Jaya P., (1982)
Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems
Moily, Jaya P., (1986)
Procedures for determining relative frequencies of production/order in multistage assembly systems
Moily, Jaya P., (1987)