//-->
Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
Kubiak, W., (1997)
A comment on "A simple sequencing algorithm for mixed-model assembly lines in just-in-time production systems"
Yeomans, J.S., (1994)
A Computational Analysis of Balanced JIT Optimization Algorithms
Kovalyov, M.Y., (2001)