Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note
Year of publication: |
2014
|
---|---|
Authors: | Chiu, Yuan-Shyi Peter ; Chang, Huei-Hsin |
Published in: |
Economic Modelling. - Elsevier, ISSN 0264-9993. - Vol. 37.2014, C, p. 143-148
|
Publisher: |
Elsevier |
Subject: | Manufacturing | Production run time | Machine breakdown | Defective item | Failure in rework | Production |
-
Optimal run time for EPQ model with scrap, rework and stochastic breakdowns : a note
Chiu, Yuan-shyi Peter, (2014)
-
Chiu, Singa Wang, (2013)
-
Chiu, Singa Wang, (2013)
- More ...
-
Chiu, Yuan-Shyi Peter, (2014)
-
Chiu, Yuan-Shyi Peter, (2013)
-
Chiu, Yuan-Shyi Peter, (2011)
- More ...