Optimal run time for EPQ model with scrap, rework and stochastic breakdowns : a note
Year of publication: |
2014
|
---|---|
Authors: | Chiu, Yuan-shyi Peter ; Chang, Huei-sin |
Published in: |
Economic modelling. - Amsterdam [u.a.] : Elsevier, ISSN 0264-9993, ZDB-ID 86824-3. - Vol. 37.2014, p. 143-148
|
Subject: | Manufacturing | Production run time | Machine breakdown | Defective item | Failure in rework | Production | Lagermanagement | Warehouse management | Instandhaltung | Maintenance policy | Qualitätsmanagement | Quality management | Produktionssystem | Manufacturing system | Losgröße | Lot size | Produktionsplanung | Production planning | Mathematische Optimierung | Mathematical programming | USA | United States | Theorie | Theory |
-
Liu, Xuejuan, (2017)
-
Bouslah, Bassem, (2016)
-
Rivera-Gómez, Héctor, (2013)
- More ...
-
A hybrid finite production rate system featuring random breakdown and rework
Chiu, Singa Wang, (2020)
-
Tseng, Chao-Tang, (2014)
-
Chiu, Yuan-Shyi Peter, (2014)
- More ...