Optimal scheduling for sequentially connected cluster tools with dual-armed robots and a single input and output module
| Year of publication: |
1-15 June 2017
|
|---|---|
| Authors: | Kim, Dae-Kyu ; Kim, Hyun-Jung ; Lee, Tae-Eog |
| Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 55.2017, 11/12 (1/15.6.), p. 3092-3109
|
| Subject: | multi-cluster tool | optimal scheduling | robot scheduling | semiconductor manufacture | workload analysis | Roboter | Robot | Scheduling-Verfahren | Scheduling problem | Halbleiterindustrie | Semiconductor industry | Theorie | Theory |
-
Robot scheduling for mobile-rack warehouses : human-robot coordinated order picking systems
Wang, Zheng, (2022)
-
Siebert, Matias, (2018)
-
Li, You, (2017)
- More ...
-
Scheduling dual-armed cluster tools with cleaning processes
Kim, Heejung, (2013)
-
Bounds for parallel machine scheduling with predefined parts of jobs and setup time
Kim, Hyun-Jung, (2018)
-
Parallel machine scheduling with multiple processing alternatives and sequence-dependent setup times
Kim, Jun, (2021)
- More ...