//-->
Optimal sequencing of test conditions in 2 k factorial experimental design for run-size minimization
Tsao, H.-S.Jacob, (2008)
Rule-based forecasting and production control system design utilizing a feedback control architecture
Liu, Hongrui, (2011)
A Five-Year Development Plan for the California Aviation Database
Tsao, H.-S. Jacob, (1999)