Optimal testing strategies in overlapped design process
Testing is an important activity in product development. Past studies, which are developed to determine the optimal scheduling of tests, often focused on single-stage testing of sequential design process. This paper presents an analytical model for the scheduling of tests in overlapped design process, where a downstream stage starts before the completion of upstream testing. We derive optimal stopping rules for upstream and downstream stages' testing, together with the optimal time elapsed between beginning the upstream tests and beginning the downstream development. We find that the cost function is first convex then concave increasing with respect to upstream testing duration. A one-dimensional search algorithm is then proposed for finding the unique optimum that minimizes the overall cost. Moreover, the impact of different model parameters, such as the problem-solving capacity and opportunity cost, on the optimal solution is discussed. Finally, we compare the testing strategies in overlapped process with those in sequential process, and get some additional results. The methodology is illustrated with a case study at a handset design company.
Year of publication: |
2010
|
---|---|
Authors: | Qian, Yanjun ; Xie, Min ; Goh, Thong Ngee ; Lin, Jun |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 206.2010, 1, p. 131-143
|
Publisher: |
Elsevier |
Keywords: | Product development Multi-stage tests Problem-solving Concurrent engineering Overlapping |
Saved in:
Online Resource
Saved in favorites
Similar items by person
-
Optimal testing strategies in overlapped design process
Qian, Yanjun, (2010)
-
Optimal testing strategies in overlapped design process
Qian, Yanjun, (2010)
-
A novel approach to DSM-based activity sequencing problem
Qian, Yanjun, (2011)
- More ...