Optimization-based heuristics for underground mine scheduling
Year of publication: |
2015
|
---|---|
Authors: | O'Sullivan, Dónal ; Newman, Alexandra |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 241.2015, 1 (16.2.), p. 248-259
|
Subject: | Mining/metals industries | determining optimal operating policies at an underground mine | Production/scheduling applications | production scheduling at an underground mine | Integer programming applications | determining a production schedule | Bergbau | Mining | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Prozessmanagement | Business process management | Ganzzahlige Optimierung | Integer programming | Operations Research | Operations research | Produktionsplanung | Production planning |
-
Production scheduling for strategic open pit mine planning : a mixed-integer programming approach
Rivera Letelier, Orlando, (2020)
-
Barrick's Turquoise Ridge gold mine optimizes underground production scheduling operations
Brickey, Andrea, (2020)
-
Barrick's Turquoise Ridge gold mine optimizes underground production scheduling operations
Brickey, Andrea, (2021)
- More ...
-
Optimization-based heuristics for underground mine scheduling
O’Sullivan, Dónal, (2015)
-
C OPTIMAL ALLOCATION - Implementing a production schedule at LKAB's Kiruna Mine Cc:240
Kuchta, Mark, (2006)
-
Safeway Designs Mixed-Product Pallets to Support Just-in-Time Deliveries
Chao, John, (2005)
- More ...