Performance Evaluation of a production Line with Random Processing Times Under Cyclical Scheduling.
| Year of publication: |
1997
|
|---|---|
| Authors: | Tan, B. ; Karabati, S. |
| Institutions: | İktisat Bölümü, İktisadi ve İdari Bilimler Fakültesi |
| Subject: | PRODUCTION | MANUFACTURING SYSTEMS |
-
Tan, B., (1997)
-
Reliability Modelling of Manufacturing Systems with Multiple Repair Modes
Calabria, R., (1989)
-
Distributed manufacturing network models of smart and agile mini-factories
Rauch, Erwin, (2017)
- More ...
-
Stochastic Cyclic Scheduling Problem in Synchronous Assembly and Production Lines
Tan, B., (1997)
-
Tan, B., (2000)
-
Karabati, S., (1998)
- More ...