Performance evaluation of the croissant production line with reparable machines
Year of publication: |
2015
|
---|---|
Authors: | Tsarouhas, Panagiotis H. |
Published in: |
Journal of industrial engineering international. - Heidelberg : SpringerOpen, ISSN 2251-712X, ZDB-ID 2664907-X. - Vol. 11.2015, p. 101-110
|
Subject: | Manufacturing systems | Performance evaluation | Markov chain | Croissant production line | Reparable machines | Produktionssystem | Manufacturing system | Markov-Kette | Fertigungsprogramm | Master production schedule | Theorie | Theory | Performance-Messung | Performance measurement | Produktionssteuerung | Production control | Fließfertigung | Assembly-line production | Scheduling-Verfahren | Scheduling problem |
Type of publication: | Article |
---|---|
Type of publication (narrower categories): | Aufsatz in Zeitschrift ; Article in journal |
Language: | English |
Other identifiers: | 10.1007/s40092-014-0087-1 [DOI] hdl:10419/157425 [Handle] |
Source: | ECONIS - Online Catalogue of the ZBW |
-
Hybrid approach for buffer allocation in open serial production lines
Kose, Simge Yelkenci, (2015)
-
Increasing production rate in Kanban controlled assembly lines through preventive maintenance
Ruifeng, Chen, (2012)
-
Guo, Weihong, (2020)
- More ...
-
Equipment performance evaluation in a production plant of traditional Italian cheese
Tsarouhas, Panagiotis H., (2013)
-
Evaluation of overall equipment effectiveness in the beverage industry : a case study
Tsarouhas, Panagiotis H., (2013)
-
Overall equipment effectiveness (OEE) evaluation for an automated ice cream production line
Tsarouhas, Panagiotis H., (2019)
- More ...