//-->
Predictive-reactive scheduling on a single resource with uncertain future jobs
Yang, Bibo, (2008)
A single resource scheduling problem with job-selection flexibility, tardiness costs and controllable processing times
Yang, Bibo, (2007)
Inventory and lead time planning with lead-time-sensitive demand