//-->
Hybrid matheuristics to solve the integrated lot sizing and scheduling problem on parallel machines with sequence-dependent and non-triangular setup
Carvalho, Desiree M., (2022)
Decomposition methods for the parallel machine scheduling problem with setups
Tran, Tony T., (2016)
Solving no-wait two-stage flexible flow shop scheduling problem with unrelated parallel machines and rework time by the adjusted discrete Multi Objective Invasive Weed Optimization and fuzzy dominance approach
Jafarzadeh, Hassan, (2017)
A note on scheduling identical parallel machines with preemptions and setup times
Boudhar, Mourad, (2025)
Scheduling on parallel machines with preemption and transportation delays
Haned, Amina, (2012)
Scheduling on identical machines with preemption and setup times
Haned, Amina, (2024)