Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
| Year of publication: |
2017
|
|---|---|
| Authors: | Schnabel, André ; Kellenbrink, Carolin ; Helber, Stefan |
| Publisher: |
Hannover : Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät |
| Subject: | Project scheduling | encodings | heuristics | local-search | genetic algorithm | RCPSP | overtime |
| Series: | |
|---|---|
| Type of publication: | Book / Working Paper |
| Type of publication (narrower categories): | Working Paper |
| Language: | English |
| Other identifiers: | 88695052X [GVK] hdl:10419/172847 [Handle] RePEc:han:dpaper:dp-593 [RePEc] |
| Classification: | C61 - Optimization Techniques; Programming Models; Dynamic Analysis ; C44 - Statistical Decision Theory; Operations Research ; M11 - Production Management |
| Source: |
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2017)
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2018)
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2018)
- More ...
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2018)
-
Kellenbrink, Carolin, (2022)
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2018)
- More ...