Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Year of publication: |
2017
|
---|---|
Authors: | Schnabel, André ; Kellenbrink, Carolin ; Helber, Stefan |
Publisher: |
Hannover : Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät |
Subject: | Project scheduling | encodings | heuristics | local-search | genetic algorithm | RCPSP | overtime |
Series: | |
---|---|
Type of publication: | Book / Working Paper |
Type of publication (narrower categories): | Working Paper |
Language: | English |
Other identifiers: | 88695052X [GVK] hdl:10419/172847 [Handle] RePEc:han:dpaper:dp-593 [RePEc] |
Classification: | C61 - Optimization Techniques; Programming Models; Dynamic Analysis ; C44 - Statistical Decision Theory; Operations Research ; M11 - Production Management |
Source: |
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2017)
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2018)
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2018)
- More ...
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2018)
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2017)
-
Profit-oriented scheduling of resource-constrained projects with flexible capacity constraints
Schnabel, André, (2018)
- More ...