PSO and simulated annealing for the two-machine flowshop scheduling problem with coupled-operations
Year of publication: |
2018
|
---|---|
Authors: | Meziani, Nadjat ; Boudhar, Mourad ; Oulamara, Ammar |
Published in: |
European journal of industrial engineering : EJIE. - Genevè : Inderscience Enterprises Ltd., ISSN 1751-5254, ZDB-ID 2384377-9. - Vol. 12.2018, 1, p. 43-66
|
Subject: | flowshop | coupled-operations | makespan | PSO | simulated annealing | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Durchlaufzeit | Lead time | Algorithmus | Algorithm | Simulation |
-
Paredes-Astudillo, Yenny Alexandra, (2024)
-
Henneberg, M., (2016)
-
A two-stage three-machine assembly scheduling problem with a position-based learning effect
Wu, Chin-Chia, (2018)
- More ...
-
Two-machine flowshop scheduling problem with coupled-operations
Meziani, Nadjat, (2019)
-
Two-stage hybrid flow shop with recirculation
Boudhar, Mourad, (2010)
-
Scheduling: Agreement graph vs resource constraints
Bendraouche, Mohamed, (2015)
- More ...