//-->
AGV dispatching based on workload balancing
Kim, C.W., (1999)
Estimation of tool requirements in single-stage multimachine systems
Koo, P.-H., (1998)
A spreadsheet model approach for integrating static capacity planning and stochastic queueing models
Koo, P.-H., (1995)