Real-time performance evaluation and improvement of assembly systems with Bernoulli machines and finite production runs
Year of publication: |
2019
|
---|---|
Authors: | Jia, Zhiyang ; Zhao, Kaixin ; Zhang, Yan ; Dai, Yaping ; Liu, Chang |
Subject: | assembly systems | Bernoulli machine | bottleneck analysis | flexible manufacturing system | real-time performance evaluation | Fließfertigung | Assembly-line production | Flexibles Fertigungssystem | Flexible manufacturing system | Produktionssystem | Manufacturing system | Theorie | Theory | Produktionssteuerung | Production control | Performance-Messung | Performance measurement | Engpass | Bottleneck |
-
Bai, Yishu, (2023)
-
Alavian, Pooya, (2017)
-
Profitability of a multi-model manufacturing line versus multiple dedicated lines
Dolgui, Alexandre, (2021)
- More ...
-
Jia, Zhiyang, (2016)
-
Jia, Zhiyang, (2019)
-
Dynamic performance prediction in flexible production lines with two geometric machines
Chen, Jingchuan, (2022)
- More ...