//-->
Reducing exposed copper on annular rings in a PCB factory through implementation of a Six Sigma project
Lee, Kuo-Liang, (2009)
Lee, Kuo-liang, (2009)
Reducing mold changing time by implementing Lean Six Sigma
Lee, Kuo-Liang, (2010)