//-->
A fuzzy pert approach to evaluate plant construction project scheduling risk under uncertain resources capacity
Hsiau, Hsian Jong, (2009)
Network decomposition-based lower and upper bounds for the discrete time-cost tradeoff problem
Akkan, Can, (2000)
Prioritätsregelbasierte Ressourcenplanung für Projekte mit komplexer Ablaufstruktur
Holzer, Achim, (2000)
Job-shop resource scheduling via simulating random operations
Golenko-Ginzburg, Dimitri, (1997)
Optimal job-shop scheduling with random operations and cost objectives
Golenko-Ginzburg, Dimitri, (2002)
A heuristic for network project scheduling with random activity durations depending on the resource allocation
Golenko-Ginzburg, Dimitri, (1998)