//-->
Towards an integrated workload control (WLC) concept : the performance of due date setting rules in job shops with contingent orders
Thürer, Matthias, (2013)
On non-permutation solutions to some two machine flow shop scheduling problems
Strusevich, Vitaly A., (1991)
Two machine open shop scheduling problem with setup, processing and removal times separated
Approximation algorithms for minimizing the total weighted number of late jobs with late deliveries in two-level supply chains
Steiner, George, (2009)
Minimizing the weighted number of tardy jobs with due date assignment and capacity-constrained deliveries
Steiner, George, (2011)
Optimal delivery time quotation in supply chains to minimize tardiness and delivery costs
Dumitrescu, Sorina, (2015)