//-->
Complexity of the two-stage no-wait assembly problem with setup and removal times separated
Strusevich, Vitaly A., (1991)
Modelling and solving a cost-oriented resource-constrained multi-model assembly line balancing problem
Pereira, Jordi, (2018)
Mixed-model sequencing with reinsertion of failed vehicles : a case study for automobile industry
Yilmazlar, I. Ozan, (2024)
Balancing a sequence-dependent disassembly line using simulated annealing algorithm
Kalayci, Can B., (2013)
A two-phase variable neighbourhood search algorithm for assembly line worker assignment and balancing problem type-II : an industrial case study
Polat, Olcay, (2016)
A hybrid genetic algorithm for sequence-dependent disassembly line balancing problem
Kalayci, Can B., (2016)