//-->
Scheduling a dynamic flexible flow line with sequence-dependent setup times : a simulation analysis
Kia, H. R., (2010)
A high performing metaheuristic for multi-objective flowshop scheduling problem
Karimi, N., (2014)
A knowledge-based approach for multi-factory production systems
Karimi, N., (2017)