//-->
Scheduling in a two-machine flowshop for the minimization of the mean absolute deviation from a common due date
Sakuraba, Celso S., (2009)
Analyzing the behaviors of virtual cells (VCs) and traditional manufacturing systems: ant colony optimization (ACO)-based metamodels
Kesen, Saadettin Erhan, (2009)
Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date
Błażewicz, Jacek, (2008)
Scheduling identical jobs and due-window on uniform machines
Mosheiov, Gur, (2010)
Minimum weighted number of tardy jobs on an m-machine flow-shop with a critical machine
Due-date assignment on uniform machines
Mosheiov, Gur, (2009)