Scheduling component placement operations for collect-and-place type PCB assembly machines
Year of publication: |
2009
|
---|---|
Authors: | Kulak, Özgür ; Bulkan, Serol ; Günther, Hans-Otto |
Published in: |
Operations research proceedings 2008 : selected papers of the annual international conference of the German Operations Research Society (GOR) University of Augsburg, September 3 - 5, 2008. - Berlin : Springer, ISBN 978-3-642-00141-3. - 2009, p. 129-134
|
Subject: | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Produktionssteuerung | Production control |
-
Controlling work in process during semiconductor assembly and test operations
Zhang, Chuwen, (2017)
-
Performance analysis of flow lines with non-linear flow of material
Helber, Stefan, (1999)
-
Constraint propagation algorithms for the car sequencing problem
Matthiessen, Lars, (2000)
- More ...
-
Einsatz von Simulations- und Optimierungsmodellen in der chemischen Industrie
Günther, Hans-Otto, (1999)
-
Workload planning in small lot printed circuit board assembly
Günther, Hans-Otto, (1995)
-
Personalkapazitätsplanung und Arbeitsflexibilisierung
Günther, Hans-Otto, (1989)
- More ...