Scheduling distributed flowshops with flexible assembly and set-up time to minimise makespan
Year of publication: |
1-15 May 2018
|
---|---|
Authors: | Zhang, Guanghui ; Xing, Keyi ; Cao, Feng |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 56.2018, 9 (1/15.5.), p. 3226-3244
|
Subject: | distributed flowshop scheduling | flexible assembly | set-up time | variable neighbourhood search | particle swarm optimisation | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Fließfertigung | Assembly-line production | Heuristik | Heuristics | Simulation | Just in Time | Just in time |
-
Maleki-Darounkolaei, Aref, (2012)
-
Robust scheduling for a two-stage assembly shop with scenario-dependent processing times
Wu, Chin-Chia, (2021)
-
Tajbakhsh, Zahra, (2014)
- More ...
-
Zhang, Guanghui, (2019)
-
Kou, Huaqin, (2015)
-
Wang, Bingqian, (2022)
- More ...