Scheduling in Dual Gripper Robotic Cells for Productivity Gains
Year of publication: |
2015
|
---|---|
Authors: | Sethi, Suresh ; Sidney, Jeff ; Sriskandarajah, Chelliah |
Publisher: |
[S.l.] : SSRN |
Subject: | Roboter | Robot | Produktivität | Productivity | Scheduling-Verfahren | Scheduling problem | Fertigungsinsel | Cellular manufacturing | Fließfertigung | Assembly-line production | Produktionsplanung | Production planning |
-
Scheduling Dual Gripper Robotic Cell : One-Unit Cycles
Drobouchevitch, Inna, (2015)
-
Sequencing and Scheduling in Robotic Cells : Recent Developments
Dawande, Milind, (2015)
-
Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot
Sriskandarajah, Chelliah, (2015)
- More ...
-
A Note on Productivity Gains in Flexible Robotic Cells
Geismar, Neil, (2015)
-
On Throughput Maximization in Constant Travel-Time Robotic Cells
Dawande, Milind, (2002)
-
On the Interaction Between Demand Substitution and Production Changeovers
Dawande, Milind, (2010)
- More ...