Scheduling just-in-time part supply for mixed-model assembly lines
With increasing cost competition and product variety, providing an efficient just-in-time (JIT) supply has become one of the greatest challenges in the use of mixed-model assembly line production systems. In the present paper, therefore, we propose a new approach for scheduling JIT part supply from a central storage center. Usually, materials are stored in boxes that are allotted to the consumptive stations of the line by a forklift. For such a real-world problem, a new model, a complexity proof as well as different exact and heuristic solution procedures are provided. Furthermore, a direct comparison with a simple two-bin kanban system is provided. Such a system is currently applied in the real-world industrial process that motivates our research. It becomes obvious that this policy is considerably outperformed according to the resulting inventory- and [alpha]-service levels. Moreover, at the interface between logistics and assembly operations, strategic management implications are obtained. Specifically, based on the new approach, it is the first time a statistical analysis is being made as to whether widespread Level Scheduling policies, which are well-known from the Toyota Production System, indeed facilitate material supply. Note that in the literature it is frequently claimed that this causality exists.
Year of publication: |
2011
|
---|---|
Authors: | Boysen, Nils ; Bock, Stefan |
Published in: |
European Journal of Operational Research. - Elsevier, ISSN 0377-2217. - Vol. 211.2011, 1, p. 15-25
|
Publisher: |
Elsevier |
Keywords: | Scheduling Mixed-model assembly line Just-in-time In-house logistics |
Saved in:
Saved in favorites
Similar items by person
-
Scheduling Just-in-Time Part Supplyfor Mixed-Model Assembly Lines
Bock, Stefan, (2010)
-
Scheduling just-in-time part supply for mixed-model assembly lines
Boysen, Nils, (2010)
-
Scheduling of inventory releasing jobs to satisfy time-varying demand
Boysen, Nils, (2011)
- More ...