//-->
Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems
Bai, S.X., (1994)
Scheduling manufacturing systems with work-in-process inventory control: Single-part-type systems
Bai, S.X., (1995)
Hierarchical production control for a flow shop with dynamic setup changes and random machine breakdowns
Bai, S.X., (1996)