Scheduling of a no-wait two-machine flow shop with sequence-dependent setup times and probable rework using robust meta-heuristic
Year of publication: |
2012
|
---|---|
Authors: | Rabiee, M. ; Zandieh, M. ; Jafarian, A. |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 24 (15.12.), p. 7428-7446
|
Subject: | desirability | imperialist competitive algorithm | no-wait two-machine flow shop | probable rework | response surface methodology | sequence-dependent setup times. | Durchlaufzeit | Lead time | Algorithmus | Algorithm | Scheduling-Verfahren | Scheduling problem | Heuristik | Heuristics | Fließfertigung | Assembly-line production |
-
Navaei, Javad, (2014)
-
Shokrollahpour, E., (2011)
-
Yu, Jae-Min, (2017)
- More ...
-
Rabiee, M., (2012)
-
Bi-objective partial flexible job shop scheduling problem: NSGA-II, NRGA, MOGA and PAES approaches
Rabiee, M., (2012)
-
Bi-objective partial flexible job shop scheduling problem : NSGA-II, NRGA, MOGA and PAES approaches
Rabiee, M., (2012)
- More ...