Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time
Year of publication: |
2008
|
---|---|
Authors: | Leung, Joseph Y.-T. ; Li, Haibing ; Pinedo, Michael |
Published in: |
Annals of operations research. - Dordrecht, The Netherlands : Springer Nature B.V., ISSN 0254-5330, ZDB-ID 252629-3. - Vol. 159.2008, p. 107-123
|
Subject: | Scheduling-Verfahren | Scheduling problem | Flexibles Fertigungssystem | Flexible manufacturing system | Beschaffung | Procurement | Operations Research | Operations research | Theorie | Theory |
-
Penz, Louise, (2023)
-
Throughput optimization in two-machine flowshops with flexible operations
Crama, Yves, (2010)
-
A column generation-based approach for proportionate flexible two-stage no-wait job shop scheduling
Pei, Zhi, (2020)
- More ...
-
Scheduling orders for multiple product types with due date related objectives
Leung, Joseph Y.-T., (2006)
-
Open shops with jobs overlap--revisited
Leung, Joseph Y.-T., (2005)
-
Leung, Joseph Y.-T., (2006)
- More ...