Scheduling technicians for planned maintenance of geographically distributed equipment
A real-world planned maintenance scheduling problem that exists at several business units within United Technologies Corporation (UTC) is addressed in this paper. The scheduling problem is formulated as a multiple tour maximum collection problem with time-dependent rewards and an adaptive memory tabu search heuristic is developed to solve it. The effectiveness of the proposed solution approach is examined using real-world problem instances supplied by UTC. Relevant upper bounds are derived for the application. Results of numerical experiments indicate that the proposed tabu search heuristic is able to obtain near optimal solutions for large-size (i.e., actual) problem instances in reasonable computation time.
Year of publication: |
2007
|
---|---|
Authors: | Tang, Hao ; Miller-Hooks, Elise ; Tomastik, Robert |
Published in: |
Transportation Research Part E: Logistics and Transportation Review. - Elsevier, ISSN 1366-5545. - Vol. 43.2007, 5, p. 591-609
|
Publisher: |
Elsevier |
Keywords: | Multiple tour maximum collection problem Time dependent Selective traveling salesman problem Tabu search Maintenance scheduling |
Saved in:
Saved in favorites
Similar items by person
-
Scheduling technicians for planned maintenance of geographically distributed equipment
Tang, Hao, (2007)
-
Modeling and optimization control of a demand-driven, conveyor-serviced production station
Tang, Hao, (2015)
-
A coupled three dimensional model of vanadium redox flow battery for flow field designs
Yin, Cong, (2014)
- More ...