Scheduling Two-Agents with a Time-Dependent Deterioration to Minimize the Minsum Earliness Measures
Year of publication: |
2014
|
---|---|
Authors: | Cheng, Shuenn-Ren |
Published in: |
Asia-Pacific Journal of Operational Research (APJOR). - World Scientific Publishing Co. Pte. Ltd., ISSN 1793-7019. - Vol. 31.2014, 05, p. 1450040-1
|
Publisher: |
World Scientific Publishing Co. Pte. Ltd. |
Subject: | Scheduling | single-machine | two-agent | time-dependent deterioration |
-
Two-agent single-machine scheduling with cumulative deterioration
Chen, Ren-Xia, (2019)
-
Competitive two-agent scheduling with release dates and preemption on a single machine
Li, Shi-Sheng, (2023)
-
Some new problems on two-agent scheduling to minimize the earliness costs
Cheng, Shuenn-Ren, (2014)
- More ...
-
A study on the factors affecting stock liquidity
Cheng, Shuenn-Ren, (2007)
-
Some new problems on two-agent scheduling to minimize the earliness costs
Cheng, Shuenn-ren, (2014)
-
A study on the factors affecting stock liquidity
Cheng, Shuenn-Ren, (2007)
- More ...