Scheduling with multiple tasks per job : the case of quality control laboratories in the pharmaceutical industry
Year of publication: |
2012
|
---|---|
Authors: | Ruiz-Torres, Alex J. ; Ablanedo-Rosas, José H. ; Otero, L. Daniel |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 3 (1.2.), p. 691-705
|
Subject: | flowtime | number of late jobs | production planning | quality control | quality planning | real world applications | scheduling | Qualitätsmanagement | Quality management | Scheduling-Verfahren | Scheduling problem | Produktionsplanung | Production planning | Pharmaindustrie | Pharmaceutical industry | Produktionssteuerung | Production control |
-
Dynamic lot sizing in biopharmaceutical manufacturing
Sahling, Florian, (2019)
-
Kumar, Sandeep, (2017)
-
Optimal control of an imperfect repetitive synchronised production environment
Hassini, Elkafi, (2016)
- More ...
-
Ruiz-Torres, Alex J., (2012)
-
Makespan and workstation utilization minimization in a flowshop with operations flexibility
Ruiz-Torres, Alex J., (2011)
-
Minimizing the number of tardy jobs in the flowshop problem with operation and resource flexibility
Ruiz-Torres, Alex J., (2010)
- More ...