//-->
Complexity of server scheduling on parallel dedicated machines subject to fixed job sequences
Cheng, T. C. E., (2021)
On scheduling of step-improving jobs to minimize the total weighted completion time
Cheng, T. C. E., (2024)
Two-stage flow shop scheduling with dedicated machines
Lin, Bertrand M. T., (2015)