Shift planning under delay uncertainty at air France : a vehicle-scheduling problem with outsourcing
Year of publication: |
2020
|
---|---|
Authors: | Poullet, Julie ; Parmentier, Axel |
Published in: |
Transportation science : a journal of the Institute for Operations Research and the Management Sciences. - Catonsville, MD : Transportation Science & Logistics Society of the Institute for Operations Research and the Management Sciences, ISSN 0041-1655, ZDB-ID 160958-0. - Vol. 54.2020, 4, p. 956-972
|
Subject: | stochastic ground-staff scheduling | stochastic shift planning | column generation | stochastic resource-constrained shortest path | vehicle-scheduling problem with outsourcing | Outsourcing | Stochastischer Prozess | Stochastic process | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Produktionsplanung | Production planning |
-
Chang, Kuo-Hao, (2024)
-
Optimal production planning in stochastic jobshops with long-run average cost
Presman, Ernst, (2000)
-
Hierarchical Production and Setup Scheduling in Stochastic Manufacturing Systems
Sethi, Suresh, (2017)
- More ...
-
Future memories are not needed for large classes of POMDPs
Cohen, Victor, (2023)
-
Learning to approximate industrial problems by operations research classic problems
Parmentier, Axel, (2022)
-
Aircraft routing and crew pairing : updated algorithms at Air France
Parmentier, Axel, (2020)
- More ...