Short-term production scheduling with non-triangular sequence-dependent setup times and shifting production bottlenecks
Year of publication: |
2021
|
---|---|
Authors: | Berkhout, Joost ; Pauwels, Eric ; Mei, R. D. van der ; Stolze, Jan ; Broersen, Siem |
Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 59.2021, 3, p. 727-751
|
Subject: | animal-feed industry | non-triangular sequence-dependent setup times | production scheduling | scheduling | shifting production bottlenecks | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Engpass | Bottleneck | Produktionsplanung | Production planning | Theorie | Theory |
-
A production scheduling problem with sequence-dependent changeover costs
Li, Qingwei, (2014)
-
A genetic algorithm for scheduling open shops with sequence-dependent setup times
Abreu, Levi R., (2020)
-
A robust optimization approach for the unrelated parallel machine scheduling problem
Vega, Jonathan de la, (2023)
- More ...
-
Literature survey on automatic pipe routing
Blokland, Mark, (2023)
-
Polling systems with Markovian server routing
Mei, R. D. van der, (1995)
-
The power-series algorithm applied to polling systems with a dormant server
Blanc, J. P., (1993)
- More ...