//-->
Scheduling commercial advertisements for television
GarcĂa-Villoria, Alberto, (2015)
Maximising profit for multiple-product, single-period, single-machine manufacturing under sequential set-up constraints that depend on lot size
Trigos, Federico, (2016)
An adaptive penalty guided genetic algorithm for scheduling parallel batch processing machines
Xu, Shubin, (2018)
A computational study on the quadratic knapsack problem with multiple constraints
Wang, Haibo, (2012)
A penalty function approach to Max 3-SAT problems
Kofler, Christian, (2014)
Distressed Chinese firm prediction with discretized data
Huang, Jun, (2017)