A simulated annealing heuristic for scheduling to minimize mean weighted tardiness in a flowshop with sequence-dependent setup times of jobs -- A case study
Year of publication: |
1997
|
---|---|
Authors: | Parthasarathy, S. ; Rajendran, C. |
Published in: |
Production planning & control : PPC. - London [u.a.] : Taylor & Francis, ISSN 0953-7287, ZDB-ID 10481977. - Vol. 8.1997, 5, p. 475
|
Saved in:
Saved in favorites
Similar items by person
-
Parthasarathy, S., (1997)
-
Enterprise resource planning (ERP) and it infrastructures : a managerial and technical perspective
Parthasarathy, S., (2011)
-
A logical model for the remote control of power system topology
Parthasarathy, S., (1979)
- More ...