Simultaneous optimization of capacity and planned lead time in two-stage production system with different custom due dates
Year of publication: |
2011
|
---|---|
Authors: | Altendorfer, Klaus ; Minner, Stefan |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 213.2011, 1 (16.8.), p. 134-146
|
Subject: | Kapazitätsplanung | Capacity planning | Durchlaufzeit | Lead time | Theorie | Theory | Produktionssystem | Manufacturing system | Scheduling-Verfahren | Scheduling problem | Produktionsplanung | Production planning |
-
A global scheduling approach for cycle time control in complex manufacturing systems
Barhebwa-Mushamuka, Félicien, (2023)
-
Modelling and solving approaches for scheduling problems in reconfigurable manufacturing systems
Delorme, Xavier, (2024)
-
Capacity planning in the presence of sequence-dependent setups at astrazeneca pharmaceuticals
Fleischhacker, Adam, (2015)
- More ...
-
Altendorfer, Klaus, (2012)
-
Altendorfer, Klaus, (2015)
-
Altendorfer, Klaus, (2015)
- More ...