Simultaneous structuring and scheduling of multiple projects with flexible project structures
Year of publication: |
2020
|
---|---|
Authors: | Hoffmann, Luise-Sophie ; Kellenbrink, Carolin ; Helber, Stefan |
Published in: |
Journal of Business Economics. - Berlin, Heidelberg : Springer, ISSN 1861-8928. - Vol. 90.2020, 5-6, p. 679-711
|
Publisher: |
Berlin, Heidelberg : Springer |
Subject: | Multi-project scheduling | Flexible projects | Genetic algorithms | RCPSP | RCMPSP |
Type of publication: | Article |
---|---|
Type of publication (narrower categories): | Article |
Language: | English |
Other identifiers: | 10.1007/s11573-020-00993-z [DOI] |
Classification: | C61 - Optimization Techniques; Programming Models; Dynamic Analysis ; M11 - Production Management |
Source: |
-
Simultaneous structuring and scheduling of multiple projects with flexible project structures
Hoffmann, Luise-Sophie, (2020)
-
Scheduling resource-constrained projects with a flexible project structure
Kellenbrink, Carolin, (2013)
-
Scheduling resource-constrained projects with a flexible project structure
Kellenbrink, Carolin, (2013)
- More ...
-
Simultaneous structuring and scheduling of multiple projects with flexible project structures
Hoffmann, Luise-Sophie, (2020)
-
Scheduling resource-constrained projects with a flexible project structure
Kellenbrink, Carolin, (2013)
-
Quality- and profit-oriented scheduling of flexible resource-constrained projects
Kellenbrink, Carolin, (2014)
- More ...