Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan
Year of publication: |
2008
|
---|---|
Authors: | Allaoui, H. ; Lamouri, S. ; Artiba, A. ; Aghezzaf, E. |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 10925260. - Vol. 112.2008, 1, p. 161-167
|
Saved in:
Saved in favorites
Similar items by person
-
Allaoui, H., (2008)
-
Scheduling of a two-machine flowshop with availability constraints on the first machine
Allaoui, H., (2006)
-
Scheduling of a two-machine flowshop with availability constraints on the first machine
Allaoui, H., (2006)
- More ...