Single machine scheduling problem with interval processing times to minimize mean weighted completion time
Year of publication: |
2014
|
---|---|
Authors: | Allahverdi, Ali ; Aydilek, Harun ; Aydilek, Asiye |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 51.2014, p. 200-207
|
Subject: | Scheduling | Single machine | Mean completion time | Uncertainty | Heuristics | Scheduling-Verfahren | Scheduling problem | Heuristik | Theorie | Theory | Durchlaufzeit | Lead time | Operations Research | Operations research | Terminplanung | Time scheduling | Produktionssteuerung | Production control |
-
Minimizing maximum tardiness on a single machine with family setup times and machine disruption
Molaee, Ehsan, (2021)
-
A dominance-based heuristic to minimise completion time variance in a single machine system
Soroush, H. M., (2019)
-
Time-flexible min completion time variance in a single machine by quadratic programming
Nasini, Stefano, (2024)
- More ...
-
Aydilek, Asiye, (2013)
-
Aydilek, Asiye, (2013)
-
Aydilek, Asiye, (2015)
- More ...