//-->
Single machine scheduling with preventive maintenances
Batun, S., (2009)
Flow shop-sequencing problem with synchronous transfers and makespan minimization
Soylu, B., (2007)
A fixed job scheduling problem with machine-dependent job weights
Eliiyi, D.T., (2009)